In May 2020 we finally moved into our new office building with adjacent hall on Rudolf-Diesel-Strasse in Wesel. We are happy to have more space for administration, storage and production/construction. Thanks to the new possibilities, we have already created new jobs and look positively into the future!
Reducing station R5 10-6bar track
Type ADUV-250-250-150 Straight-through body design Body Material GP240GH (1.0619) Flange design Water connection Material P250GH (1.0460) Design parameters 25 bar / 250 °C Seat: Ø…